| Pitch | Area ft² | Squares | Share |
|---|---|---|---|
| 4/12 | 196 | 2.0 | 8% |
| 4.5/12 | 7 | 0.1 | 0% |
| 6/12 | 23 | 0.2 | 1% |
| 6.5/12 | 20 | 0.2 | 1% |
| 7/12 | 2,245 | 22.4 | 88% |
| 8.5/12 | 9 | 0.1 | 0% |
| 11/12 | 55 | 0.6 | 2% |
No vents, pipes or exhausts are marked: count pipe boots on site.
| Edge | Length |
|---|---|
| Eaves | 257 ft 10 in |
| Rakes | 16 ft 4 in |
| Ridges | 25 ft 11 in |
| Hips | 176 ft 1 in |
| Valleys | 31 ft 8 in |
| Step flashing | 69 ft 8 in |
| Wall / headwall flashing | 30 ft 11 in |
| Transitions (pitch change) | 2 ft 2 in |
| Drip edge (eaves + rakes) | 274 ft 1 in |
| Hip & ridge cap (hips + ridges) | 202 ft 0 in |
| Waste | 0% | 5% | 7% | 10% | 12% | 14% ★ | 15% | 17% | 20% | 22% |
|---|---|---|---|---|---|---|---|---|---|---|
| Area ft² | 2,554 | 2,682 | 2,733 | 2,809 | 2,860 | 2,912 | 2,937 | 2,988 | 3,065 | 3,116 |
| Squares | 25.5 | 26.8 | 27.3 | 28.1 | 28.6 | 29.1 | 29.4 | 29.9 | 30.6 | 31.2 |
★ Suggested waste, worked out from this roof's hips, valleys, rakes, eaves and flashing per square.
| ✓ | Item | Qty | Unit |
|---|---|---|---|
| Shinglesat 14% waste · 3 bundles per square; at 0%: 77, 10%: 85, 15%: 89, 20%: 92 | 88 | bundles | |
| Starter strip313 lf · eaves + rakes + waste, 105 lf per bundle | 3 | bundles | |
| Hip & ridge cap231 lf · hips + ridges + waste, 25 lf per bundle | 10 | bundles | |
| Ice & water shield445 lf · eaves + valleys + step / wall / curb flashing + waste; 36 in x 66.7 ft rolls | 7 | rolls | |
| Synthetic underlayment10 squares per roll, +10% laps | 3 | rolls | |
| Drip edge10 ft pieces (274 lf before waste) · eaves + rakes + waste | 32 | pieces | |
| Valley metal8 ft sheets · valleys + waste | 5 | pieces | |
| Step flashing8 runs · one per shingle course (5 in exposure) along walls, chimneys and skylights | 176 | pieces | |
| Kick-out flashingone where each step-flashed wall ends at an eave | 9 | pieces | |
| Wall / headwall flashing10 ft pieces · level roof edges against a wall + waste | 4 | pieces | |
| Ridge vent4 ft pieces · ridges only | 7 | pieces | |
| Coil nailsabout 16 squares per box | 2 | boxes | |
| Pipe boots / ventsnot counted · none marked on the drawing: count on site | — | ||
| Guttersalong the eaves (verify on site) | 258 | lf | |
| Downspouts88 lf · 1 per ~35 ft of gutter, eave height + 2 ft | 8 | each |
The roof was traced and checked by the EZ Roofing measurement team on high-resolution aerial imagery, with each face's pitch taken from 3D surface data and checked against elevation data where it is available. Areas are true sloped areas; lengths follow the drawn roof lines. Material quantities use standard coverage figures and include the suggested waste.