| Pitch | Area ft² | Squares | Share |
|---|---|---|---|
| 5/12 | 1,414 | 14.1 | 100% |
No penetrations are marked on the drawing: count vents, pipes, chimneys and skylights on site.
| Edge | Length |
|---|---|
| Eaves | 85 ft 1 in |
| Rakes | 68 ft 2 in |
| Ridges | 42 ft 7 in |
| Hips | — |
| Valleys | — |
| Drip edge (eaves + rakes) | 153 ft 4 in |
| Hip & ridge cap (hips + ridges) | 42 ft 7 in |
| Waste | 0% | 5% | 6% ★ | 7% | 10% | 12% | 15% | 17% | 20% | 22% |
|---|---|---|---|---|---|---|---|---|---|---|
| Area ft² | 1,414 | 1,485 | 1,499 | 1,513 | 1,555 | 1,584 | 1,626 | 1,654 | 1,697 | 1,725 |
| Squares | 14.1 | 14.8 | 15.0 | 15.1 | 15.6 | 15.8 | 16.3 | 16.5 | 17.0 | 17.3 |
★ Suggested waste, worked out from this roof's hips, valleys, rakes, eaves and flashing per square.
| ✓ | Item | Qty | Unit |
|---|---|---|---|
| Shinglesat 6% waste · 3 bundles per square; at 0%: 43, 10%: 47, 15%: 49, 20%: 51 | 45 | bundles | |
| Starter strip163 lf · eaves + rakes + waste, 105 lf per bundle | 2 | bundles | |
| Hip & ridge cap46 lf · hips + ridges + waste, 25 lf per bundle | 2 | bundles | |
| Ice & water shield91 lf · eaves + valleys + step / wall / curb flashing + waste; 36 in x 66.7 ft rolls | 2 | rolls | |
| Synthetic underlayment10 squares per roll, +10% laps | 2 | rolls | |
| Drip edge10 ft pieces (153 lf before waste) · eaves + rakes + waste | 17 | pieces | |
| Ridge vent4 ft pieces · ridges only | 11 | pieces | |
| Coil nailsabout 16 squares per box | 2 | boxes | |
| Pipe boots / ventsnot counted · none marked on the drawing: count on site | — | ||
| Guttersalong the eaves (verify on site) | 85 | lf | |
| Downspouts48 lf · 1 per ~35 ft of gutter, eave height + 2 ft | 3 | each |
The roof was traced and checked by the EZ Roofing measurement team on high-resolution aerial imagery, with each face's pitch taken from 3D surface data and checked against elevation data where it is available. Areas are true sloped areas; lengths follow the drawn roof lines. Material quantities use standard coverage figures and include the suggested waste.
Measurements are made remotely and are provided for estimating and ordering. Verify on site before work begins: layers, decking condition, hidden flashing and penetrations under trees cannot be seen from above. Measurement rp0042 · engine v9 2026-11-20 · measured November 23, 2026.